How we do it.
Five steps from your buy box to a signed PSA. You make the decisions. We do the legwork.
40+ acres, 345 kV within 1 mi, outside flood zone, Ellis County, TX
parcelsRanked by fit
- 1Parcel 041241.2 ac · 0.28 mi to 345 kVOff market
- 2Parcel 118764.8 ac · 0.52 mi to 345 kVListed
- 3Parcel 093688.0 ac · 0.74 mi to 345 kVOff market
Checks38 parcels found
- Flood zone9 ruled outFEMA
- Wetlands7 ruled outUSFWS
- Zoning15 ruled outCounty
- Local opposition4 ruled outMinutes
- 38292273 of 38 pass
Parcel 0412Ellis County, TX · 41.2 ac
- Ahead in queue3 projectsERCOT
- SubstationVenus 345 kVEIA
- Spare capacity180 MWOur estimate
- Asked the utilityOpen, study neededCall
- The utility confirms the final connection.
Parcel 0412Owner · 3 filings
- Owner of recordEllis Ranch Partners LLCCounty
- Managing memberWhitfield Land Co. LPTX SOS
- General partnerDana WhitfieldTX SOS
DraftYour 41.2 acres on FM 985
Owner contacted
Evidence packParcel 0412 · 5 documents
- Site record41.2 ac on FM 985County
- Power estimate180 MW at VenusMireye
- Title and ownerClear titleClerk
- Zoning letterIndustrial by rightCounty
- LOICountersigned13 Nov
Ready to sign of 5 cited
How we compare.
Most teams find the land first and the power problem later. We research both at once.
Without Mireye 40 weeks
- Find, 6 weeks
- Check, 4 weeks
- Research, 14 weeks
- Reach, 8 weeks
- Close, 8 weeks
With Mireye 10 weeks
- Find, week 1 to 3
- Check, week 2 to 4
- Research, week 2 to 9
- Reach, week 4 to 8
- Close, week 7 to 10
30 weeks sooner
An example for one site. Yours depends on the market and the utility.
What you get.
Take one, or all four.
You do it
Software
Mireye Land keeps your buy boxes, ranked sites, power research and verified leads in one place.
AI agents
The utility research agent works each shortlisted site. Others screen and call owners.
Reports
Already have a site? A sourced report on its power, its deal-killers and its owner.
Outcome as a service
Our team works your buy box with you until a site is under contract.
We do it for you
Questions, answered.
What buyers ask us before they send a buy box.
Power research
Powered land is a site where enough electricity can be delivered soon enough for the project. A substation or a big line nearby does not make a site powered. What counts is the spare capacity on that circuit, the upgrades planned and who has already applied for it.
We get load studies and circuit drawings directly from the utility, and our utility research agent reads what the utility and the grid operator publish: hosting-capacity maps, interconnection queues and grid plans. We run injection studies and power-flow modeling on that record. Every number carries its source and date.
Yes. We request load studies and circuit drawings from utilities, co-ops and municipal providers, and we ask them about specific substations and circuits. We also track which ones move quickly on new load. That shows where a request is likely to go through, which a capacity map cannot.
No. Our numbers are screening evidence, and only the utility confirms a connection. We rank sites so you pay for load studies on the ones most likely to pass.
It depends on the utility and the distance to the substation. A site that needs a line extension or a substation upgrade can wait years. We flag planned upgrades and how fast that utility has moved on similar requests, so time to power is part of the ranking.
By project
We start from substations and transmission lines with estimated headroom, then screen every parcel around them against your buy box. A substation next door is not capacity, so each site gets its queue, grid plans and past studies read. Shortlisted sites get a direct question to the utility.
Most utilities ask for a site plan, a single line diagram, a load schedule and charger cut sheets with the service application. That is roughly a 30% design set. Our agents draft the single line diagram and the CD10 and CD30 sets, so the application is ready when you control the site.
Public maps cover a small share of distribution lines and rarely tag phase. We trace 3-phase lines from imagery and pole lines for the sites on your shortlist, and mark what we could not confirm.
A closed plant or a retired generator often still has energized service or an existing interconnection. Reusing it can skip the multi-year queue a new site waits in. In North Carolina we screened 5.8 million parcels down to 14 brownfield sites with their owners.
Working with Mireye
A verified lead is a site that passes your buy box, has its power researched, and has an owner who told us they are willing to sell or to hear an offer. You get the owner's name and how to reach them, so your team only calls people who will talk.
Data centers from 1 MW inference sites to 345 kV campuses, EV charging hubs and fleet depots, battery storage, solar and brownfield redevelopment. If the project needs land and power, the same research applies.
Yes. We screen every parcel in the market, listed or not. We find the person behind the LLC and contact them, and the ones who are open to selling come to you as verified leads.
No. You set the buy box, run the negotiation and make every decision. We do the sourcing, the power research, the first owner outreach and the diligence prep. We are not a brokerage.
Across the United States. How deep the power research goes depends on what each utility publishes. So far we have worked sites in Texas, California, the Carolinas, Illinois and Ohio.
Send a market and a megawatt number, or book a 15-minute call. We usually begin with a paid pilot on one to three buy boxes, measured on a milestone you set, such as a site under PSA.
Used by agents and teams at